cross banding
- cross banding的基本解釋
-
-
頻率交聯(lián), 交叉結(jié)合, 交叉排列
- 相關(guān)中文詞匯
- 頻率交聯(lián)
- 交叉結(jié)合
- 交叉排列
- 更多網(wǎng)絡(luò)例句與cross banding相關(guān)的網(wǎng)絡(luò)例句 [注:此內(nèi)容來源于網(wǎng)絡(luò)自拍日韩在线视频播放,僅供參考]
-
Steel banding before the foundation set in the center of the cushion, and cross through the center axis for vertical and horizontal, and then through the center ring for radiation tendons and tendon distance and ring the number.
鋼筋綁扎前,先在墊層上定出基礎(chǔ)中心點(diǎn)欧美性荡视频,并通過中心點(diǎn)定出縱橫十字軸線精品一区在线,再通過中心點(diǎn)定出輻射筋和環(huán)筋的距離和環(huán)數(shù)免费的三级黄网站。
-
One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.
其中筒身施工采取循環(huán)作業(yè)18禁免费无码无遮挡网站老男人,其施工程序?yàn)椋航壴采礓摻钪两M裝好的門架橫梁下面—→一次性澆筑混凝土700mm 高—→初滑三個(gè)行程(即75mm 高度)—→檢查滑出混凝土合適度及滑模系統(tǒng)工作狀況—→繼續(xù)澆筑混凝土500mm 高—→再滑升三個(gè)行程—→澆筑混凝土至模板上口—→轉(zhuǎn)入正彻访夥咽悠担滑升,每次滑升500mm 高—→分層交圈綁扎鋼筋—→澆筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循環(huán)往復(fù)直至筒身澆筑完成wwwjizzjizzjizz。
-
One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.
其中筒身施工采取循環(huán)作業(yè)一级黄片;一被-,其施工程序?yàn)椋航壴采礓摻钪两M裝好的門架橫梁下面—→一次性澆筑混凝土700mm 高—→初滑三個(gè)行程(即75mm 高度)—→檢查滑出混凝土合適度及滑模系統(tǒng)工作狀況—→繼續(xù)澆筑混凝土500mm 高—→再滑升三個(gè)行程—→澆筑混凝土至模板上口—→轉(zhuǎn)入正尘镁妹夥芽雌患叮滑升,每次滑升500mm 高—→分層交圈綁扎鋼筋—→澆筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循環(huán)往復(fù)直至筒身澆筑完成女人自慰喷水的网站。
- 更多網(wǎng)絡(luò)解釋與cross banding相關(guān)的網(wǎng)絡(luò)解釋 [注:此內(nèi)容來源于網(wǎng)絡(luò)亚洲国产精彩视频,僅供參考]
-
crossband transponder:交叉頻帶發(fā)送機(jī)
交叉頻帶的 crossband | 交叉頻帶發(fā)送機(jī) crossband transponder | 頻率交聯(lián),交向排列 cross-banding